Building Facade Inspections

Want create site? Find Free WordPress Themes and plugins.
Slide background

Building Facade Inspections Montreal

Building Facade Inspections Montreal

Since March 18 2013, following the adoption of the Règlement visant à améliorer la sécurité dans le bâtiment (Bill 122) and of the Code de sécurité, chapter Building, owners of 5-storey and higher buildings have the obligation to present to RBQ every 5 years a detailed report, issued and signed by an engineer or an architect, indicating that the facade does not represent a safety hazard. Our methodology follows the ASTM E2270-05 “Standard Practice for Periodic Inspection of Building Facades for Unsafe Conditions” includes a complete review of construction plans and/or on-site analysis, visual and thermal examination of the facade and further related investigations. If the building is aged 10 years or more March 18 2013, the report has to be issued according to the following schedule:

  • More than 45 years of age: deadline – March 17 2015
  • 25 to 45 years of age: deadline – March 17 2016
  • 15 to 25 years of age: deadline – March 17 2017
  • 10 to 15 years of age: deadline – March 17 2018

Our procedure includes the following services:

  • Preliminary information meeting with the owner/manager
  • Free estimate
  • On-site survey drawings, construction document analysis (if available), facade inspection (using state-of-the-art equipment), thermal imaging, facade inspection, photos
  • Complete report with compliance recommendations:
  • Inspection registry update as requested by the RBQ
  • Courtesy 6 months prior to inspection follow-up